-
White Water Centre – Feasibility Study
Feasibility study at the Lee Valley White Water Centre, exploring options for incorporating the existing temporary cabins into permanent and coherent fixtures.
16/07/2020 -
Bittern Information Point
The Bittern Information Point for the Lee Valley Regional Park Authority gets the go ahead to move from feasibility to scheme level design for planning.
19/03/2018
Loading posts...
This error message is only visible to WordPress admins
Error: No connected account.
Please go to the Instagram Feed settings page to connect an account.