White Water Centre – Feasibility Study 16/07/2020 Design & Dev, Feasibility Feasibility study at the Lee Valley White Water Centre, exploring options for incorporating the existing temporary cabins into permanent and coherent fixtures. Older Post Goldhurst Terrace Newer Post Bittern Information Point